
Pedal cluster removed.
|

Pedal cluster removed.
|

Interior removed.
|

DS Engman long kit welded in place.
|

DS front fender ready for GT flare.
|

Poor sidemarker delete patch will be replaced.
|

GT flare welded on and smoothed.
|

GT flare welded on and smoothed.
|

GT flare welded on and smoothed.
|

Starting DS rear GT flare. Notice the holes under the bondo.
|

Previous damage revealed.
|

Previous damage revealed.
|

Bondo on PS rear.
|

Previous damage on PS rear.
|

Damage straightened and GT flare bolted on.
|

GT flare welded into place.
|

GT flare welded into place.
|

Welds smoothed out.
|

Welds smoothed out.
|

Lifting the chassis up.
|

Chassis on Celette bench getting straightened.
|

Poor patch on PS firewall.
|

Poor floor pan patch was laid over top and spot welded.
|

Poor floor pan patch was laid over top and spot welded.
|

Poor floor pan patch removed.
|

Replacement metal fully seam welded.
|

Replacement metal fully butt welded.
|

Inner structure rust holes to be patched.
|

DS rear damaged section removed.
|

Replacement panel getting prepped.
|

New section in place and ground.
|

Flare installed.
|

Crunched metal discovered.
|

Donor replacement piece welded in.
|

Radiator inlet screen welded in.
|

Exit vent screens in place.
|

Exit vent screens in place.
|

Front suspension braces welded in.
|