
|

|

Flares installed and bodywork started.
|

Flares on.
|

More flare pics.
|

More flare pics.
|

More flare pics.
|

Inner rear box section welded in.
|

2270 engine build starting.
|

Machined and cleaned.
|

Cleaned studs, soda blasted, and machined.
|

Mockup assembly to check clearances.
|

Preparing the build.
|

Engine case machined.
|

Engine case cleaned and prepped.
|

Test fitting crank and cam.
|

Shortblock assembled.
|

78mm crank and Type4Store cam.
|

Engine and transmission removed.
|

Draining 901 transmission.
|

Gear stack removed from case.
|

Pinion bearing wear.
|

Main shaft bearing wear.
|

1st gear slider.
|

1st Gear Synchro
|

1st Gear Teeth
|

2nd gear side of slider.
|

2nd Gear dogteeth.
|

2nd Gear Synchro
|

3rd gear side of slider.
|

3rd Gear Syncro
|

3rd Gear Dogteeth
|

4th gear side of slider.
|

4th Gear Synchro
|

4th Gear Teeth
|

5th gear side of slider.
|

5th Gear Synchro
|

5th Gear Teeth
|

Hoffman RS+ heads installed.
|

911 swivel foot adjusters.
|

Pinion shaft assembled.
|

Input shaft assembled.
|

Transmission complete.
|

Rusty hell-hole.
|

Patch panel tacked into place.
|

Seam welded and ground.
|

Inner fender panel welded.
|

Finished engine bay metalwork.
|

Engine and trans parts zinc plated.
|

Poorly installed hinge bracket.
|

New rear hinge bracket.
|

Wiring harness layout.
|

Wiring harness ready for heat shrink.
|

EV14 Injectors
|

MicroSquirt fuel injection almost done.
|

Seam welding GT cooler opening.
|

Ground and smoothed.
|

Engine bay seals installed.
|

Engine bay seals installed.
|

Poor fuel pump relocation solder joint.
|

Poor fuel pump relocation solder joint.
|

Fuel pump wire fixed and protected.
|

Preparing to install engine and transmission.
|

Drivetrain going in.
|

Engine installed.
|

Engine installed.
|

Rewiring third brake light with correct 914 color wires.
|

Shifter disassembled.
|

Shift rod wear.
|

Shift rod welded and reground.
|

Ready to reassemble.
|

Assembled shifter.
|

Custom bumper rechromed.
|