1970 Porsche 914/6
1970 Porsche 914/6
Color: Signal Orange
Engine Size: 3.2


Rear valence as delivered.

Rear valence as delivered.

Rear valence as delivered.

Rear valence as delivered.

Rear valence as delivered.

Rear valence, 90% welded and smoothed.

Rear valence, 90% welded and smoothed.

Rear valence, 90% welded and smoothed.

Rear valence, 90% welded and smoothed.

Tail pipe cutout removed.

New cutout, trial mounted on the car.

New cutout, trial mounted on the car.

New cutout, trial mounted on the car.

New cutout, trial mounted on the car.

New cutout, trial mounted on the car.

Valence grill mockup. Area _INSIDE_ the green tape will be removed.

Valence grill mockup. Area _INSIDE_ the green tape will be removed.

Valence grill mockup. Area _INSIDE_ the green tape will be removed.

Valence grill mockup. Area _INSIDE_ the green tape will be removed.

Valence grill mockup. Area _INSIDE_ the green tape will be removed.

Final mockup, these vinyl stickers will be traced and cut out.

Holes cut out.

Holes cut out.

First screen welded in.

First screen welded in.

Rust bubbles.

Rust holes underneath the paint.

Cut out and seam sealer removed.

Cut out and seam sealer removed.

Rust converter is applied and primer sealer sprayed on top.

New patch welded in.

New patch welded in.

Pedal cluster removed.

Area cleaned up (rust converter will be applied during reinstall).

Original condition pedal cluster.

Original condition pedal cluster.

Original condition pedal cluster.

Original condition pedal cluster.

Original condition pedal cluster.

Passengers side rust cut out.

Passengers side rust fixed.

Passengers side rust fixed.

Drivers front fender straightened.

Drivers front fender straightened.

Drivers jack point, cracked.

Drivers jack point welded.

Each leg individually welded.

Finished valence, ready for paint.

Rockers textured and primered.

Rockers textured and primered.

Rockers textured and primered.

Rockers painted.

Rockers painted.

Final paint.

Final paint.

Final paint.

Final paint.

Finished rear valence installed.

Finished rear valence installed.

Patch work after paint.

Rear valence installed.

Rear valence installed.

Patch work after paint.

Carpet holes trimmed.

Seat upholstery.

Carpet holes trimmed.

Carpet holes trimmed.

Suspension removed.

Suspension removed.

Suspension pieces before.

Suspension pieces after blasting.

Powder coated suspension.

Powder coating detail shot.

Powder coating detail shot.

Installing the front bearings.

Front bearings installed.

Drivers A-arm installed.

Passenger A-arm installed.

Installing the rear bearings

Rear bearing detail.

Trailing arms reinstalled.

Rebuilt pedal cluster installed.

A second option for carpet.

Installing the roll bar vinyl.

Installing the roll bar vinyl.

Vinyl installed.

Vinyl installed.
back to main