
Rear valence as delivered.
|

Rear valence as delivered.
|

Rear valence as delivered.
|

Rear valence as delivered.
|

Rear valence as delivered.
|

Rear valence, 90% welded and smoothed.
|

Rear valence, 90% welded and smoothed.
|

Rear valence, 90% welded and smoothed.
|

Rear valence, 90% welded and smoothed.
|

Tail pipe cutout removed.
|

New cutout, trial mounted on the car.
|

New cutout, trial mounted on the car.
|

New cutout, trial mounted on the car.
|

New cutout, trial mounted on the car.
|

New cutout, trial mounted on the car.
|

Valence grill mockup. Area _INSIDE_ the green tape will be removed.
|

Valence grill mockup. Area _INSIDE_ the green tape will be removed.
|

Valence grill mockup. Area _INSIDE_ the green tape will be removed.
|

Valence grill mockup. Area _INSIDE_ the green tape will be removed.
|

Valence grill mockup. Area _INSIDE_ the green tape will be removed.
|

Final mockup, these vinyl stickers will be traced and cut out.
|

Holes cut out.
|

Holes cut out.
|

First screen welded in.
|

First screen welded in.
|

Rust bubbles.
|

Rust holes underneath the paint.
|

Cut out and seam sealer removed.
|

Cut out and seam sealer removed.
|

Rust converter is applied and primer sealer sprayed on top.
|

New patch welded in.
|

New patch welded in.
|

Pedal cluster removed.
|

Area cleaned up (rust converter will be applied during reinstall).
|

Original condition pedal cluster.
|

Original condition pedal cluster.
|

Original condition pedal cluster.
|

Original condition pedal cluster.
|

Original condition pedal cluster.
|

Passengers side rust cut out.
|

Passengers side rust fixed.
|

Passengers side rust fixed.
|

Drivers front fender straightened.
|

Drivers front fender straightened.
|

Drivers jack point, cracked.
|

Drivers jack point welded.
|

Each leg individually welded.
|

Finished valence, ready for paint.
|

Rockers textured and primered.
|

Rockers textured and primered.
|

Rockers textured and primered.
|

Rockers painted.
|

Rockers painted.
|

Final paint.
|

Final paint.
|

Final paint.
|

Final paint.
|

Finished rear valence installed.
|

Finished rear valence installed.
|

Patch work after paint.
|

Rear valence installed.
|

Rear valence installed.
|

Patch work after paint.
|

Carpet holes trimmed.
|

Seat upholstery.
|

Carpet holes trimmed.
|

Carpet holes trimmed.
|

Suspension removed.
|

Suspension removed.
|

Suspension pieces before.
|

Suspension pieces after blasting.
|

Powder coated suspension.
|

Powder coating detail shot.
|

Powder coating detail shot.
|

Installing the front bearings.
|

Front bearings installed.
|

Drivers A-arm installed.
|

Passenger A-arm installed.
|

Installing the rear bearings
|

Rear bearing detail.
|

Trailing arms reinstalled.
|

Rebuilt pedal cluster installed.
|

A second option for carpet.
|

Installing the roll bar vinyl.
|

Installing the roll bar vinyl.
|

Vinyl installed.
|

Vinyl installed.
|