
Core heads, ready to get rebuilt.
|

Core heads, ready to get rebuilt.
|

Core heads, ready to get rebuilt.
|

Core Engine
|

Engine completely disassembled.
|

Engine completely disassembled.
|

Checking deck height.
|

Checking chamber volume.
|

Installing cylinders.
|

Pistons
|

Longblock complete.
|

Longblock complete.
|

Installing the L-Jet FI.
|

Leaking exhaust flanges.
|

100% flat exhaust flanges.
|

Brazing EGR filter pipes.
|

Exhausting pipes installed.
|

Fully dressed and ready to reinstall in the 912E.
|